Commercial kitchen ventilation design guide introduction a commercial kitchen exhaust hood is only one component of the kitchen ventilation system ckv.
Commercial kitchen hvac design guidelines.
To put it simply the system pulls in outdoor air into the building through a make up air unit.
The design process for a successful kitchen ventilation system starts when.
The requirements for a restaurant hvac far exceed those of a typical non food prep commercial building.
The air that exits the building through exhaust hoods must be replaced with.
My hvac experience followed twenty years in the aerospace industry.
This design guide is intended to augment comprehensive.
A traditional hvac system utilizes a two part process.
The target audience consists of kitchen designers mechanical engineers code officials foodservice operators and property managers.
Commercial kitchen ventilation ckv has been a challenge to mechanical engineers for years.
Commercial kitchen ventilation design guide 1.
The information package should include the equipment layout the equipment shop drawings the dimen sions of the exhaust hoods selected and.
Part of the challenge comes from the fact that the mechanical engineer is normally not the kitchen consultant significant coordination is required to ensure that the kitchen ventilation is integrated with what the kitchen exhaust is doing at any given time based on the cooking activities in the.
The ckv is a subsystem of the overall building heating ventilating and air conditioning system hvac.
Requirements for a restaurant hvac.
This book is the distillation of 30 year s experience with hvac design and construction as a designer as a supervisor as an agency planner and reviewer and finally again as a free lance hvac designer of small commercial and institutional projects.
Design objectives comply with local and industry codes imc section 507 commercial kitchen hoods nfpa 96 standard for ventilation control and fire protection of commercial cooking operations ashrae 90 1 energy standard for buildings minimize cost 3.