The condensation drain coming from the refrigeration equipment is normally accompanied by a nasty slime and must not be communicating with the drain from the ice bin.
Commercial kitchen floor drain requirements.
4 diameter alterations greater than 50 shall have accessible water closets urinals and lavs.
Cpc 411 2 2 floor drains shall be installed in commercial kitchens cpc 411 4 floor shall slope to drain.
At least one mop basin will be required in or near the kitchen.
The drains must be separate not tied together.
Approx 4 diameter cpc 412 1 1 alterations greater than 50 shall have accessible water closets urinals and lavs.
In food prep areas fixture requirements may be dictated by the health codes.
140 degrees f hot water is required due to dishwashers requiring 180 degrees f water for final rinse and a booster.
Fixture type location and quality sanitary fixture requirements for customers and employees shall be permitted to be met with a single set of restrooms.
The kitchen generally requires one lavatory facility for washing hands and at least one mop basin will be required in the kitchen.
An air gap or air break are both acceptable since there.
Floor drains shall be installed in commercial kitchens floor shall slope to drain.
Waste piping that intersects or is routed above or near food preparation or storage areas requires a protective drip pan or containment.
At least one triple compartment sink will be required.
Floor surfaces shall be coved at the juncture of the floor and wall with a 3 8 inch minimum radius coving and shall extend up the wall at least 4 inches except in areas where food is stored only in unopened bottles cans cartons sacks or other original shipping containers.